Infrastructure Planning and Development
Master Planning:Developing comprehensive long-term plans for the city's infrastructure, including roads, water supply, sewerage, drainage, and solid waste management systems.
Project Planning and Design:Planning, designing, and estimating costs for various infrastructure projects.
Construction Supervision:Supervising the construction of infrastructure projects to ensure quality and adherence to standards.
Maintenance of Infrastructure:Regularly inspecting and maintaining existing infrastructure to ensure its functionality and longevity.
Road Construction and Maintenance:Constructing, repairing, and maintaining roads, streets, and sidewalks.
Stormwater Drainage:Designing, constructing, and maintaining stormwater drainage systems to prevent flooding
Solid Waste Management:Planning and implementing solid waste collection, transportation, and disposal systems.
Street Lighting:Designing, installing, and maintaining street lighting systems.
Sewerage:Planning, designing, and operating sewerage systems, including sewage treatment plants and sewer networks.
Water Supply
Planning, designing, and operating water supply systems, including water treatment plants and distribution networks.
Map representing Raw water transmission mains from Undavalli to Takkelapadu WTP
To Download the Map Click here
Map representing Water supply distribution system in Guntur Municipal Corporation
To Download the Map Click here
Water Treatment Facilities
- Filtration Plants: 4 No.’s
- Installed Capacity: 157.20 MLD
- Net Present Supply: 149.50 MLD @ 135 LPCD
Distribution Network
- Total Road Network: 1350 Kms (including NH & SH)
- Length of Pumping Main: 96 Kms
- Length of Distribution Network: 1013 Kms
Service Reservoirs
- No. of ELSRs / GLSRs: 41
- Total Capacity: 52,058 KL
House Service Connections
- Total Assessments: 213,270 Nos.
- Assessments with HSCs: 154,825 Nos.
- HSCs: 150,857, Metered: 3,968
Water Quality Testing Labs
No of
labs |
Location |
List of tests conducted |
No. of labs |
Location |
List of tests conducted
ULBS OWN LAB |
1 |
Narasaraopet
Road, Guntur |
Residual Chlorine, Turbidity, PH, Electrical conductivity, TDS, Ammoniacal Nitrogen, Nitrate, Hardness, Alkalinity |
1 |
Head water works Takkelapadu, Guntur |
Residual Chlorine, Turbidity, PH, Electrical conductivity, TDS, Ammoniacal Nitrogen |
Water Supply Distribution Within the Town
- Total No. of Elevated Level Reservoirs: 25 Existing + 16 APMDP
- Total Capacity of all Reservoirs: 50.26 ML
- Total No. of Bore Wells: 1665 (Working: 1589)
- Total No. of Open Wells: 97
- Total No. of Public Stand Posts: 2,945
- Total No. of Households: 178,372 Nos.
- No. of H.S. Connections: 107,893 Nos.
- Tap Rate: 104,221 Nos.
- Meter Rate: 3,672 Nos.